IT infrastructure & networking

Who it is for

Companies fitting out or moving into new premises, branches that have outgrown their network, and organisations that need a server room or an IT relocation planned properly.

IT infrastructure & networking

What is in scope

Survey and design

  • A survey of rooms, power, cable paths and existing equipment
  • A network design that matches the survey
  • A list of materials and equipment

Cabling and network

  • Structured cabling
  • Switching and Wi-Fi
  • Firewall installation and coordination with your internet provider

Server room and racks

  • Rack layout and installation
  • Power and cooling requirements stated in the design
  • Equipment installed and configured

IT relocation

  • Planning the move with the downtime window agreed
  • Disconnecting, moving, reinstalling and testing
  • Documentation of the new site
IT infrastructure & networking

What you receive

  • A survey report
  • A design and a bill of materials
  • Cabling and equipment installed, labelled and tested
  • As-built documentation: what is where, with labels
IT infrastructure & networking

What we need from you

  • Floor plans or drawings, where they exist
  • Access to the site, and permissions from the landlord or building management
  • A list of users, devices and applications
  • Details of your internet service and a contact on site
IT infrastructure & networking

How it is quoted

After a survey, itemised by area and by equipment. Hardware appears as lines you can compare, supplied and installed by MUZN IT.

What shapes the quote

  • Size and number of locations
  • Cable runs and containment
  • Equipment specified
  • Access hours, including out-of-hours work
  • Relocation distance and downtime window
IT infrastructure & networking

Questions about infrastructure

Do you survey before quoting?

Yes. The quote follows the survey, so the lines reflect the site as it is.

Can the work be done outside office hours?

Access windows, including out-of-hours work, are agreed in the proposal.

Do you supply the equipment as well?

Yes, supplied and installed by MUZN IT, and listed as separate lines in the proposal.

Do you document what you install?

Yes. As-built documentation with labels is one of the deliverables.

Can you support it after installation?

Yes, through managed support, with response times written into an agreement.